I had an opportunity to be work as a site trainee engineer at Maradu in Ernakulam district from August 2019 during the training period of DCM in Civil Talents.com. This academy work as project consultancy for this site. Er. Sureshlal S D is guiding us and giving instructions. The site project manager is Mr. Vasanth Bhat and site supervisor is Mr. Libin Anto. This site is 6000sqft of G+3 building.

 The chipping depth of the pile is measured using the instrument dumpy level. General instructions about instrument are given by the site supervisor and I measured the chipping height of the pile.

            
     Chipping of Pile                                       Taking Measurement of Pile Chipping

Work was not continuity because of heavy rain at the site. The main problem of this site was water level is high and water entering the site from drainage. Because of these problems dewatering was carried on daily. Reinforcement work will be carried out on rainy days. Due to the above-mentioned water problems pile cap shuttering done by block. 

Shuttering Block Work 
       
           M-sand Placing for Brick Work                                                  
After completion of blockwork shuttering, plain cement concrete was done for plinth beam and the reinforcement of pile cap, plinth beam, column, and side walls plunge pool and water tank are finished.
 
Reinforcement Work
Sidewall Reinforcement 
       














After the finishing of reinforcement work and also be completed the back-filling. Next was the shuttering of the plinth beam and pile cap above GL. After this work, checking of dimensions carried and the site is ready for concreting.

Concreting
          Checking Dimensions                                       
                               

Leveling

Preparing cube for testing 


 